The Fifteen Billion Pound Railway - Series 3
Sign in to watch this content please.
- Episode
- Episode 1
- Broadcast Info
- 2019 (58 mins)
- Description
- With exclusive access, this returning series follows the construction workers of Crossrail as they battle to finish the final stages of the new Elizabeth Line underground railway beneath the streets of London. Costing over fifteen billion pounds and stretching 120km across the capital, this extraordinary construction project is one of the biggest in Europe and one of the most ambitious engineering feats in Britain since the time of Brunel. Our cameras follow the engineers, technicians and train staff who are under pressure to complete their section of the project, including building and fitting out 10 brand new stations, learning to drive the new fleet of trains, and testing the 21-km twin tunnels beneath London, in a bid to make it safe for the public. We join Danny O’Connell, Crossrail’s testing manager, as he leads a critical operation to launch the very first train into the new Elizabeth Line tunnels under London. Danny’s responsible for trialling and testing all aspects of the railway performance - from communications, CCTV and platform doors, to the trains, tracks and signalling systems. If Danny can’t complete all of the hundreds of tests needed to prove its safe and reliable, the railway won’t open on time. We join charismatic Project Manager Lih Ling Highe who is tasked with finishing construction of the new Tottenham Court Road Station - the largest station on the entire line and future gateway to 200,000 passengers a day. Coming from a long line of engineers, construction is in Lih Ling’s DNA and in this episode, she must lead a team fitting out the station’s three tonne platform screen doors to prevent passengers from falling under a train. In the financial heart of London, the Elizabeth Line’s new Canary Wharf Station looks to welcome up to 100,000 passengers a day. In charge of the station’s mechanical and electrical fit out is young engineer Felix Ahatty whose biggest task is to transport and install three huge 10-tonne ventilation fans. Hauling them through the city at night, and then getting them down through the station levels, is a complex mission, even with the help of cranes, rail systems, and ‘hover’ pads to push it into position. We also join new recruit Rochelle as she trains to become a driver of the new 200m long, 90mph trains that will carry up to 200 million passengers a year. We follow Rochelle through each nail-biting step of the course - from simulator training to getting behind the wheel of a real 265-tonne train. The episode ends with the shock news that the team fail to complete the Elizabeth Line on time. With the delay costing almost three million pounds a day, every hour is critical in the race to launch the railway.
- Genre
- History; Architecture; Design; Technology; Geology; Archeaology
How to cite this record
The Open University, "The Fifteen Billion Pound Railway - Series 3". https://learningonscreen.ac.uk/ou/search/index.php/prog/232791 (Accessed 10 Jan 2025)